In October, the DEC and DEP agreed upon an Interim Ashokan Reservoir Release Protocol (Protocol), which is available here for download.
Interim Release Protocol (135.8 KiB, 1,839 hits)
DEC/DEP Interim Ashokan Release Protocol
Water Quality Monitoring for Releases (68.7 KiB, 1,579 hits)
Water Quality Monitoring Plan for Release Channel Operations
The Lower Esopus Watershed Partnership, as part of the Ashokan Release Working Group, is compiling comments on the protocol from participating municipalities to provide DEC and DEP with feedback.
The protocol includes provisions for community beneficial releases, flood mitigation releases, and turbidity control releases. The interim protocol is driving recent reservoir releases as the DEP aims for a 90% Conditional Seasonal Storage Objective outlined in the protocol to create a void in the reservoir for flood mitigation and turbidity control. Since storms Irene and Lee filled the reservoir with turbid runoff, recent releases in the lower Esopus Creek have been noticeably turbid with fine colloidal clay sediment.
3 thoughts on “DEC/DEP published Interim Release Protocol”
Comments are closed.