The Ashokan Release Channel is currently being decreased from 10 to 0 MGD. Release shut-down is being conducted to allow for valve repair and inspection of tunnels.
The current release channel turbidity is 18.50 ntu.
The Ashokan Release Channel is currently being decreased from 10 to 0 MGD. Release shut-down is being conducted to allow for valve repair and inspection of tunnels.
The current release channel turbidity is 18.50 ntu.
The Ashokan Release Channel is currently being decreased from 600 to approximately 10 MGD. The decreases will be executed in 20 to 40 MGD increments starting at 7AM and ending at 6:30PM. The current release channel turbidity is 19.00 ntu.
Since Mt. Marion gauge dropped below Action Stage, the Ashokan Release Channel will be increased today from 0 to approximately 280 MGD. The increases will be executed in 20 to 40 MDG increments. The current release channel turbidity is 7.90 ntu.
As of 1700 hrs Ashokan Release Channel was shutdown in one step from 600 mgd to 0 mgd. Shutdown was due to Mt Marion forecasted to reach action stage of 18 feet and current reading of 17.16 feet.
The Ashokan Release Channel is currently being increased today from 300 to approximately 600 MGD in 40 MDG increments. The current release channel turbidity is 8.0 ntu.
To continue with discharge mitigation in accordance with the interim release protocol, DEP has further increased flow rates in the Ashokan Release Channel in order to maintain a 10% void in the reservoir.
These discharge mitigation releases are expected to continue for approximately one week but may change with reservoir operating and downstream conditions.
The Ashokan Release Channel is currently being increased from 10 to approximately 300 MGD in 20 to 40 MDG increments, starting at 8AM this morning. The final step is scheduled for 3:30PM. The current release channel turbidity is 8.4 ntu.
The Ashokan Release Channel is being decreased today from 320 to approximately 10 MGD. The decreases have been executed in 20 to 40 MGD steps, starting at 9:30AM this morning with the final step scheduled for 5:30PM this evening.
The current release channel turbidity is 10.30 NTU.
The Ashokan Release Channel was decreased today from 480 to approximately 440 MGD. The decrease was made at 10:20AM.
The current release channel turbidity is 9.50 ntu.
The Ashokan Release Channel was decreased today from 600 to approximately 480 MGD. The decreases were made in three 40 MGD steps. The first decrease was at 2:45, the second at 3:15PM, and the third at 4:45PM.
The current release channel turbidity is 9.70 ntu.
The Ashokan Release Channel was increased this evening from 400 to approximately 600 MGD. The increases were made between 5:30 and 7:30 PM in increments of 40 MG each.
The current release channel turbidity is 13.5 ntu.